Glendun river fieldwork report CCEA

The aim of my fieldwork is to study how a river’s dynamics change downstream. Specifically I shall be looking at how particle size, discharge, cross sectional area, velocity, gradient and width change downstream.
Planning
To give a clear aim to my investigation I have decided to prove or disprove three hypotheses. These are based on the ideal river model and they are:

* Downstream discharge will increase
* Downstream particle size will decrease
* Downstream the gradient of the river will decrease
As a class we decided that the Glendun River was an appropriate river to study since its length facilitates for a noticeable change in results between its source and its mouth. The river is also only an hour’s driving time from our school and the river has relatively easy access. It also has minimum human interference which could corrupt our data. This location has also been used in past river studies by our school and no safety problems arose in the past.
We also discussed the possible safety issues that we should be aware of such as Weil’s disease, slippery rocks and pot holes in the river. We then ensured that a first aid kit was brought with us as well as mobile phones in case of an emergency and that appropriate clothing was worn. Also everyone was made aware of what procedures to follow in an emergency.
The week before the fieldtrip we conducted a small pilot study in a small stream in the grounds of our school where we tested each piece of equipment to make sure it functioned correctly. We discovered that our flow metre was faulty so we decided to instead to time how long it took for an object to cover a stretch of river. We decided to use an orange since it is buoyant and brightly coloured and to use a 10 metre stretch of river since we are using it for other measurements and it is long enough to give reliable results.
Also on the week before of our teachers went down to the river on a pre-site visit to check that all of our pre-determined sites were viable to use. She concluded that all our sites were practical to use in our investigation.
Data Collection: Collected on Thursday 25th October
The primary data used in this investigation is the results we took down on the fieldtrip. The secondary data sources we are going to use are the internet, our class notes and handouts, the David Wough AS level textbook and the Ordnance survey map.
The type of sampling used on the fieldtrip was systematic; the sites chosen to investigate were 1.3km apart. Pragmatic sampling would have to have been used in the event that one of the pre defined sites proved to be inaccessible on the day; none of which were.
Particle Size
Particle size was recorded at each stop by two people measuring the longest axis of 30 stones from the river bed while a third person recorded the results. The average of the lengths was taken for each stop. The equipment used was a metre ruler.
Cross Sectional Area
The width of the river was measured by two people with a measuring tape at either side of the river. The depth was then recorded by another person with a metre stick taking measurements from the measuring tape to the riverbed in increments of 0.5 metres until the whole width of the river was recorded and then an average depth was calculated from these results. The cross sectional area was then worked out by multiplying the average depth by the average width.
Velocity
A ten metre stretch of the river was measured with the tape measure. An orange was dropped at the upstream end and a stopwatch was used to record the time taken for the orange to travel the ten metre stretch. This was repeated three times and an average taken. If the orange got stuck that particular attempt would be scrapped and then it would be carried out again.
Gradient
The gradient of the river was calculated with an abney level and a gauging pole. We used the same ten metre marking used when we measured velocity. We took three readings along the ten metre width and calculated the average gradient from them.
Discharge
The discharge of the river was worked out by multiplying the average velocity and the average cross sectional area found at each site to give the discharge.

Order a unique copy of this paper
(550 words)

Approximate price: $22

Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

At Solution Essays, we are determined to deliver high-quality papers to our clients at a fair price. To ensure this happens effectively, we have developed 5 beneficial guarantees. This guarantees will ensure you enjoy using our website which is secure and easy to use.

Money-back guarantee

Most companies do not offer a money-back guarantee but with Solution Essays, it’s either a quality paper or your money back. Our customers are assured of high-quality papers and thus there are very rare cases of refund requests due to quality concern.

Read more

Zero-plagiarism guarantee

All our papers are written from scratch and according to your specific paper instructions. This minimizes any chance of plagiarism. The papers are also passed through a plagiarism-detecting software thus ruling out any chance of plagiarism.

Read more

Free-revision policy

We offer free revisions in all orders delivered as long as there is no alteration in the initial order instruction. We will revise your paper until you are fully satisfied with the order delivered to you.

Read more

Privacy policy

All data on our website is stored as per international data protection rules. This ensures that any personal data you share with us is stored safely. We never share your personal data with third parties without your consent.

Read more

Fair-cooperation guarantee

Ordering and sending money to us is an indication that you are purchasing our products and services. To have business talks laid out in the official language, you can check on our terms and conditions and get more information about this.

Read more

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Order your essay today and save 20% with the discount code: LEMONADEPlace Order